top of page

All lanes between J3-4 of the M20 will now be resurfaced with low-noise surfacing

  • Writer: Ryarsh Protection Group
    Ryarsh Protection Group
  • Aug 20, 2018
  • 1 min read

ALL lanes between J3-4 of the M20 will now be resurfaced with low-noise surfacing as part of the M20 J3-5 Smart Motorway Scheme, meaning Addington, Ryarsh, Birling and Leybourne Chase shall now benefit.


We have achieved 2/3 of our targets, so far! We shall continue to make the case for sound barriers between J3-4.


✅ Increased quality and quantity of tree plantings

✅ Additional lanes resurfaced with low-noise material

⬜ Installation of sound barriers where not currently proposed


See KMTV's report:

コメント


この投稿へのコメントは利用できなくなりました。詳細はサイト所有者にお問い合わせください。
Post: Blog2_Post
  • Twitter
  • Instagram
  • Facebook

©2019 by Ryarsh Protection Group

Website created by Matthew Pope with the Ryarsh Protection Group

bottom of page